SAP PP Basics of MRP Area https://blogs.sap.com/2015/07/01/basics-of-mrp-area/ The purpose of this document is to explain the basics of MRP area, steps involved in activating MRP area and to use it in different possible ways. As we know MRP runs
SAP PP 流程订单后续的备料TO确认后想改某个原料的批次号然后重新备料,如何做? Process order: M35040 The TR document 271120 for this process order, LT04 to convert TR to TO, Save it. Batch determination was conducted. Once TO was confirmed, the batch of components was updat
SAP PP 启用Storage Location Level 的MRP Area之后对于SD的影响初探 Storage location level MRP Area CN07_WS setting: Finished product material: F000201336. The initial stock for this material: In 1001(existing site), we have 4400 EA, in 1003 (new site), we
SAP PP 计划外发料与计划内发料在WM层面的差异初探 Process order header material: HR0072 BOM item materials: RR0078 R0078A R0880A Control cycle master data: they are all pick parts. create &release process order, M36040 Release process order, TR was created: